House 1 

The flooring panel is being installed on the 5th floor.

And the vertical constructions installation on the 6th floor.

 

House 2 section 1

The bricklaying process on the 2-3d floor has begun.

And the vertical constructions of the 5th floor are being installed.

House 2 section 2

The vertical constructions are installed on the 3d floor.