25 July 2018

July 2018

House 1
The preparation works for the vertical constructions installation on the 11th floor.
The bricks are layed on the 5th floor.

House 2 section 1
We are installing the flooring panel on the 10th floor. The masonry works are on the level of 2-6th floors.

House 2 section 2
The vertical constructions of the 7th floor has begun.

 