25 January 2018

January 2018

House 1

The monolithic works of the vertical structures of the basement are finalizing.

The monolithic works of the flooring installation on the level 0.000 are made.

 

House 2 section 1

The installation of the pile field is completed and the preparatory work for the flooring plate arrangements are done.

The waterproof finishing constructions are arranged on the level of 0.000

 

House 2 section 2

The monolithic foundation frame of the high level building is done. The waterproof finishing constructions are arranged on the level of 0.000

 