title
25 February 2018

February 2018

House 1

The flooring panel is installed on the level +0.000 (half of the ground floor). 

The vertical constructions installation process on the 1st floor.

 

House 2 section 2

The vertical constructions installation on the -1st floor, the flooring panel installation on the level +0.000 (half of the ground floor).

 

House 2 section 2

The foundation plate is installed.

 

/