25 March 2018

March 2018

House 1 

The part of the flooring panel of the 2nd floor is installed.

The waterproofing finishing is completed.

The preparation for the soil backfilling process.

 

House 2 section 1 and 2

The flooring panel is installed on the level +0.000 (half of the ground floor). 

The vertical constructions installation process on the 1st floor.

Waterproof finishing works.

 