25 November 2017

November 2017

During October and November at the construction site of the Metropolis, a set of works was carried out in the field of the planning of soil masses and compaction of the foundation pit.

Two cranes are installed. The underground structures are being arranged (the ground-works).

Work on the installation of pile foundations is being completed and preparatory work of the installation of foundation slabs is finalizing.

The process of the he gravel base preparation and the installation of a reinforcing framework for the foundation slab.