25 April 2018

April 2018

House 1

The vertical constructions are installed on the 4th floor.

The flooring panel is being installed on the 3d floor.

 

House 2 section 1

The flooring on the 2nd floor is arranged

 

House 2 section 2

The flooring on the 1st floor is arranged.

Soil backfilling process is made on both houses.

Bricklaying of the basements has begun.

 