Phone icon
CCTV icon 1
Select flat Plus icon
Phone icon
title
25 August 2018

August 2018

The August shows us great results of the building process on the construction site of Metropolis Ecosphere.
You may find the detailed status here:


House 1 

The installation of the monolithic frame on the 13th floor. We are finalizing the flooring panel installation on the 14th floor
The masonry work proceeds to the 6th floor.


House 2 section 1
The installation of the vertical constructions of the monolithic frame 11th floor.
The bricklaying proceeds to7th floor.
The bricks are purchased and for the next steps of the bricklaying on the 8-9th floors


House 2 section 2
We are installing the flooring panel on the 9th floor.
The installation of the vertical constructions of the monolithic frame is finalizing on the 8th floor. The bricks are layed up to 3d floor